Case studies
Sabato 05 Settembre 2009 07:46
PULSATION ANALYSIS OF PIPING NETWORKS | ![]() |
| Example # 1 – Analysis of the pulsations induced by a screw compressor on its delivery pipeline | ![]() |
DYNAMIC SIMULATION OF NATURAL GAS COMPRESSION AND LNG PLANTS | ![]() |
| Example # 1 – Optimisation of the admittance of a gas compression station hot by-pass line performed by the BFGS algorithm. | ![]() |
| Example # 2 – For the emergency shut down of a gas compression train, it is found the flare valve opening sequence which prevents surge conditions and involves a driver coast down time compatible with lubricant oil reserve. | ![]() |
| Example # 3 – For the start up of a gas compression train driven by an asynchronous electric driver, it is found the induction voltage sequence that avoids driver torque saturation conditions. | ![]() |
| Example # 4 – During the start up procedure of a gas compression station, interferences between the performance controllers and the surge protection systems are highlighted. These are solved by modifying the controllers enabling speed level. | ![]() |
Ultimo aggiornamento ( Sabato 26 Settembre 2009 17:36 )










